EPS@ISEP | The European Project Semester (EPS) at ISEP


Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
log [2019/06/13 13:20] – [14th Week Report] team2log [2019/06/18 10:39] (current) – [Activities] team2
Line 105: Line 105:
 ==== 14th Week Report ==== ==== 14th Week Report ====
  
-This week we finished building the prototype and we also finished the poster, manual, as well as the paper. +This weekwe finished building the prototype and we also finished the deliverables, that is to say, poster, manual, paper, video, final report, final presentation. 
 + 
 +All of this was finalized with the feedback from the supervisors and teachers.  
 + 
 + 
 +==== 15th Week Report ==== 
 + 
 +This last week, on Monday, we finalized some work on the electronics of the prototype.  
 + 
 +On Tuesday, we trained for the final presentation, and on Wednesday we had the final presentation and individual assessments.
 ===== Meetings ===== ===== Meetings =====
  
Line 266: Line 275:
 {{ :list_of_materials_update.xlsx |}} {{ :list_of_materials_update.xlsx |}}
  
-=== Minute: === 
  
  
Line 284: Line 292:
 {{ :leaflet_dryfoo_.pdf |}} {{ :leaflet_dryfoo_.pdf |}}
  
-=== Minute: === 
  
 ==== 10th Meeting  (2019-05-16) ==== ==== 10th Meeting  (2019-05-16) ====
Line 305: Line 312:
 {{ :paper.docx |}} (not in proper word paper format) {{ :paper.docx |}} (not in proper word paper format)
  
-=== Minute: === 
  
  
Line 324: Line 330:
   * Deliver the invoices of the materials   * Deliver the invoices of the materials
   * It is possible to have sensors that it can be power up with the 3,3 Volts from the Arduino?   * It is possible to have sensors that it can be power up with the 3,3 Volts from the Arduino?
-  * The fan deliver to us last meeting it is a 12 Volts fan instead of a 5 Volt.+  * The fan delivered to us last meeting is a 12 Volts fan instead of a 5 Volt.
   * Screws and Silicone.   * Screws and Silicone.
  
 About the Construction: About the Construction:
   * Workshop: Are there any announcements to be made?    * Workshop: Are there any announcements to be made? 
- 
-=== Attachments: === 
- 
-=== Minute: === 
  
 ==== 12th Meeting  (2019-05-30) ==== ==== 12th Meeting  (2019-05-30) ====
Line 367: Line 369:
   * Software:  {{ :software_layout.docx |}} {{ :video_lcd_code.mp4 |}}   * Software:  {{ :software_layout.docx |}} {{ :video_lcd_code.mp4 |}}
   * Construction: {{ :overview_parts_.jpg?linkonly |}}   * Construction: {{ :overview_parts_.jpg?linkonly |}}
-=== Minute: === 
- 
 ==== 13th Meeting  (2019-06-06) ==== ==== 13th Meeting  (2019-06-06) ====
 Chairman: Ignacio Roger Chairman: Ignacio Roger
Line 388: Line 388:
  
 === Attachments: ===  === Attachments: === 
-  * Electronics PCB+  * Electronics PCB (report)
  
-=== Minute: === 
  
  
Line 412: Line 411:
   * Manual: {{ :dryfoo_manual_fin.pdf |}}   * Manual: {{ :dryfoo_manual_fin.pdf |}}
   * Air flow scheme: {{ :air_flow_2.pdf |}}   * Air flow scheme: {{ :air_flow_2.pdf |}}
-  * Electronics+  * Electronics (report)
- +
-=== Minute: === +
-===== Activities ===== +
-//Please register here all accomplished project activities//+
  
-^ Start      ^ End       ^ Task          ^Description ^  Who^ 
-|  |  |  |  |  | 
-|  |  |  |  |  | 
QR Code
QR Code log (generated for current page)