EPS@ISEP | The European Project Semester (EPS) at ISEP


Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
log [2019/06/12 16:55] – [14th Meeting (2019-06-13)] team2log [2019/06/18 10:39] (current) – [Activities] team2
Line 105: Line 105:
 ==== 14th Week Report ==== ==== 14th Week Report ====
  
-This week, in Portuguese class, the last of the oral presentations were done.+This week, we finished building the prototype and we also finished the deliverables, that is to say, poster, manual, paper, video, final report, final presentation.
  
-We finished building the prototype and we also finished the posteras well as the paper+All of this was finalized with the feedback from the supervisors and teachers.  
 + 
 + 
 +==== 15th Week Report ==== 
 + 
 +This last week, on Monday, we finalized some work on the electronics of the prototype.  
 + 
 +On Tuesdaywe trained for the final presentation, and on Wednesday we had the final presentation and individual assessments.
 ===== Meetings ===== ===== Meetings =====
  
Line 164: Line 171:
 Clarification of technical doubts regarding the product. Reference to the steps necessary for the development of the project. Clarification of technical doubts regarding the product. Reference to the steps necessary for the development of the project.
  
-==== 3rd Meeting (2019-03-7) ====+==== 3rd Meeting (2019-03-07) ====
  
  Chairman: João Pereira  Chairman: João Pereira
Line 268: Line 275:
 {{ :list_of_materials_update.xlsx |}} {{ :list_of_materials_update.xlsx |}}
  
-=== Minute: === 
  
  
Line 286: Line 292:
 {{ :leaflet_dryfoo_.pdf |}} {{ :leaflet_dryfoo_.pdf |}}
  
-=== Minute: === 
  
 ==== 10th Meeting  (2019-05-16) ==== ==== 10th Meeting  (2019-05-16) ====
Line 307: Line 312:
 {{ :paper.docx |}} (not in proper word paper format) {{ :paper.docx |}} (not in proper word paper format)
  
-=== Minute: === 
  
  
Line 326: Line 330:
   * Deliver the invoices of the materials   * Deliver the invoices of the materials
   * It is possible to have sensors that it can be power up with the 3,3 Volts from the Arduino?   * It is possible to have sensors that it can be power up with the 3,3 Volts from the Arduino?
-  * The fan deliver to us last meeting it is a 12 Volts fan instead of a 5 Volt.+  * The fan delivered to us last meeting is a 12 Volts fan instead of a 5 Volt.
   * Screws and Silicone.   * Screws and Silicone.
  
 About the Construction: About the Construction:
   * Workshop: Are there any announcements to be made?    * Workshop: Are there any announcements to be made? 
- 
-=== Attachments: === 
- 
-=== Minute: === 
  
 ==== 12th Meeting  (2019-05-30) ==== ==== 12th Meeting  (2019-05-30) ====
Line 369: Line 369:
   * Software:  {{ :software_layout.docx |}} {{ :video_lcd_code.mp4 |}}   * Software:  {{ :software_layout.docx |}} {{ :video_lcd_code.mp4 |}}
   * Construction: {{ :overview_parts_.jpg?linkonly |}}   * Construction: {{ :overview_parts_.jpg?linkonly |}}
-=== Minute: === 
- 
 ==== 13th Meeting  (2019-06-06) ==== ==== 13th Meeting  (2019-06-06) ====
 Chairman: Ignacio Roger Chairman: Ignacio Roger
Line 390: Line 388:
  
 === Attachments: ===  === Attachments: === 
-  * Electronics PCB+  * Electronics PCB (report)
  
-=== Minute: === 
  
  
Line 411: Line 408:
 === Attachments: ===  === Attachments: === 
   * Paper: {{ :solar-dehydrator-eps.pdf |}}   * Paper: {{ :solar-dehydrator-eps.pdf |}}
-  * Poster: +  * Poster: {{ :poster.pdf |}} 
-  * Manual: +  * Manual: {{ :dryfoo_manual_fin.pdf |}} 
-  * Air flow scheme: +  * Air flow scheme: {{ :air_flow_2.pdf |}} 
-  * Electronics+  * Electronics (report)
- +
-=== Minute: === +
-===== Activities ===== +
-//Please register here all accomplished project activities//+
  
-^ Start      ^ End       ^ Task          ^Description ^  Who^ 
-|  |  |  |  |  | 
-|  |  |  |  |  | 
QR Code
QR Code log (generated for current page)